Rooftop solar for your home, with PM Surya Ghar subsidy helpआपके घर के लिए रूफटॉप सोलर, PM सूर्य घर सब्सिडी के साथ

Cut your electricity bill with a rooftop solar system designed for your roof, your load and Rajasthan's sun. ATTPL Solar handles the survey, design, DISCOM application, installation, net meter and subsidy claim, and stays with you for maintenance.छत के हिसाब से सही साइज़ का सोलर लगवाएँ और बिजली बिल घटाएँ। सर्वे, डिज़ाइन, DISCOM आवेदन, इंस्टॉलेशन, नेट मीटर और सब्सिडी क्लेम तक, सब ATTPL सोलर संभालता है।

Family on the terrace of their Jaipur home with a new rooftop solar system

How much solar does my home need?मेरे घर को कितना सोलर चाहिए?

A simple rule: in Rajasthan, 1 kW of rooftop solar produces roughly 4 to 5 units (kWh) a day on average across the year, depending on tilt, shade, dust and the season. Divide your average monthly units by about 120 to 140 to get an approximate size, then check that your roof has about 80 to 100 sq ft of shade-free area per kW. Our calculator does this for you.

  • Bill of 150 to 300 units a month: about 1 to 2 kW
  • 300 to 450 units: about 2 to 3 kW
  • 450 to 700 units: about 3 to 5 kW
  • Above 700 units, or ACs and EV charging: 5 kW and more

On-grid, hybrid or off-gridऑन-ग्रिड, हाइब्रिड या ऑफ-ग्रिड

  • On-grid with net metering

    Lowest cost per unit. Surplus units go to the grid and are adjusted in your bill as per the DISCOM rules. No backup during a power cut (for safety).

  • Hybrid with batteries

    Works like on-grid and also runs chosen loads during power cuts. Costs more because of batteries; LFP batteries last longest.

  • Off-grid

    For farm houses and places without a reliable grid connection. Batteries are sized for nights and cloudy days.

PM Surya Ghar: Muft Bijli YojanaPM सूर्य घर: मुफ़्त बिजली योजना

Under the central scheme, a residential consumer installing rooftop solar through a registered vendor gets central financial assistance (CFA) credited to the bank account after the net meter is installed and the plant is inspected. As notified for general category states, CFA is ₹30,000 per kW for the first 2 kW and ₹18,000 for the third kW, up to ₹78,000 for systems of 3 kW and above. Group housing societies and RWAs can claim CFA for common facilities. Always check the current figures on pmsuryaghar.gov.in before you decide.

  • Panels must be DCR (made with Indian cells) and on the ALMM list
  • Apply on the national portal with your electricity consumer number
  • DISCOM feasibility, then installation by a registered vendor
  • Net meter installation and inspection, then the subsidy claim with bank details

What you get with ATTPL SolarATTPL सोलर से आपको क्या मिलेगा

  • Free site survey with shade check and roof inspection
  • A written quote with brand, model, wattage and warranty of every item
  • Structure designed for your wind zone, with waterproof fixing
  • DISCOM application, net meter and subsidy paperwork
  • App-based monitoring and a cleaning and service plan
  • One number for service: 1800 890 0815

Frequently asked questionsअक्सर पूछे जाने वाले सवाल

How long does installation take?

Installation on the roof usually takes one to three days. The full process, with DISCOM approval and the net meter, typically takes a few weeks, depending on the DISCOM's queue.

Will solar work in winter and on cloudy days?

Yes, at lower output. Over the full year, Rajasthan's sunshine makes rooftop solar one of the best investments for homes.

Can I add batteries later?

Yes, if you choose a hybrid-ready inverter now. Tell us at the survey so the design allows it.

Does solar damage the roof?

Not when installed correctly. We check the roof, use the right anchors or ballast and keep the waterproofing intact.

Not sure where to start?

Use the solar calculator for a quick estimate, or call us. We reply in Hindi or English.